Regulatory Framework

Every Permit, Every Authority

Northwest Florida's coastal and bayside environments require precise navigation of overlapping state, federal, and local regulatory frameworks. We manage every required authorization concurrently.

State Permits & Authorizations

  • FDEP Environmental Resource Permits (ERP) — Chapter 62-330, F.A.C.
  • Individual ERPs for significant wetland disturbances, dredging, or commercial marina projects (10+ slips)
  • Sovereign Submerged Lands authorizations — Letters of Consent for private docks; multi-year leases for commercial facilities
  • Proprietary authorization for use of state-owned bottomlands waterward of mean high-water line
  • Coastal Construction Control Line (CCCL) permits
  • NPDES stormwater authorizations and water quality certifications
  • Northwest Florida Water Management District coordination and compliance
  • Aquatic preserve criteria compliance for Choctawhatchee Bay, Perdido Bay, and other designated areas
FDEP · NWFWMD · Board of Trustees

Federal & Local Permits

  • U.S. Army Corps of Engineers Section 10 (navigable waters) and Section 404 (dredge/fill in waters of the U.S.)
  • State Programmatic General Permit (SPGP) streamlining for qualifying minor structures
  • Nationwide Permits and individual permit evaluations when required
  • Endangered species consultation under Section 7 / Section 10 of the Endangered Species Act
  • Manatee protection plans and specialized species authorizations
  • FDOT right-of-way access permits and driveway permits
  • Local municipal and county development orders and zoning approvals
  • Riparian setback and protrusion limit compliance (e.g., 500-ft / 20% waterbody width rules)
USACE · FDOT · Local Governments
Our Approach

A Single Partner,
Start to Finish

By serving as your dedicated point of contact across all regulatory bodies, we streamline the entire permitting pipeline — avoiding the delays and coordination gaps that come with fragmented teams.

01

Pre-Application & Site Assessment

We conduct environmental surveys, wetland delineations, and submerged aquatic vegetation assessments, then host pre-application meetings with FDEP, USACE, local governments, and other relevant agencies to identify requirements and anticipate potential issues before formal submittals begin.

02

Joint Application Preparation

We prepare comprehensive joint applications coordinating state ERP, federal USACE, sovereign submerged lands, and local development order requirements simultaneously — including all required surveys, functional assessments, engineering drawings, and impact analyses in a single, cohesive package.

03

Concurrent Submittal & Agency Coordination

Applications are submitted concurrently across all required agencies. We actively manage agency communications, respond to requests for additional information, coordinate secondary reviews (manatee protection, species consultation, NWFWMD), and track every authorization through the review pipeline in parallel.

04

Mitigation & Compliance Planning

Where impacts to wetlands or sensitive habitats are unavoidable, we develop mitigation strategies — from preservation and enhancement to restoration or mitigation bank credits — and prepare stormwater management, manatee protection, and other specialized compliance plans to satisfy all permit conditions.

05

Final Permit Issuance & Construction Support

We ensure all permits, development orders, and sovereign submerged land authorizations are in hand before construction begins, then provide ongoing compliance support during construction — including required monitoring, reporting, and any post-construction agency coordination.